The build log.
Every studio shows you the wins. We publish the whole ledger — what shipped, what got fixed, what we broke, and what each mistake cost us. If we'll be this honest about our own site, imagine what your project status calls look like.
- Entries published
- 7
- Failures, in the open
- 2
- Entries quietly deleted
- 0
Showing 7 of 7 entries. Failures stay published — nothing gets quietly deleted.
- Nov 21, 2026ShippedNov 21, 2026
The proof page: our own scores, published
Lighthouse dials, a 90-day vitals trend, and the exact command to re-run the audit ourselves. If we sell speed, we should publish our own.
commit 9f3c2a1app/proof/page.tsx +1Partner A - Nov 12, 2026FixedNov 12, 2026
Contact form double-submitted on slow 3G
On a throttled connection the submit button stayed live long enough for a second tap. Two leads arrived twice. Now the button locks on first press and the server dedupes.
commit 4b7e9d2components/contact-form.tsxPartner A - Nov 3, 2026BrokeNov 3, 2026
Broke the hero on Safari for 6 hours
A CSS feature we tested in Chrome and Firefox silently failed in Safari 17. The hero rendered blank for roughly one in five visitors until a visitor told us.
What it cost us
Six hours of a blank hero for ~18% of traffic (our Safari share). Two intro-call bookings likely lost. No data lost; the trust cost was real.
commit c21d8f0components/home-hero.tsxPartner A - Oct 27, 2026Rolled backOct 27, 2026
Rolled back the scroll-jacked case studies
We built a cinematic scroll-driven case-study page. It looked great in a demo and tested terribly: people skipped the story and missed the numbers. Reverted to the plain editorial layout.
What it cost us
Two days of build time scrapped, plus a day of user testing that told us the obvious. Lesson paid for: motion must serve the story, never gate it.
commit e5a1b7capp/case-studies/[slug]/page.tsxPartner B - Oct 16, 2026ShippedOct 16, 2026
Field Notes: the insights hub goes live
Three launch essays on prototype-first process, speed as revenue, and the anti-agency math. MDX pipeline, topic clusters, related reading — all static.
commit 7d90f3eapp/insights/page.tsx +1Partner B - Oct 8, 2026FixedOct 8, 2026
Killed the dark-mode flash on first paint
Dark-mode visitors saw a white flash before the theme applied. Moved theme resolution ahead of first paint; the flash is gone on every route.
commit a182c4dapp/layout.tsxPartner A - Sep 30, 2026ShippedSep 30, 2026
Static-first rebuild: 4.2s → 1.1s LCP
Rebuilt the marketing site fully static: every page pre-rendered at build time, images sized and lazy-loaded, zero client-side data fetching. Mobile LCP dropped from 4.2s to 1.1s.
commit 5c09b1eapp/ +1Partner A
How this log works
- Entries live in the repo as MDX — reviewed like code, published like commits. The current set is a launch snapshot; CI appends real entries and real commit SHAs as they ship.
- Every failure carries a what it cost us line. Time, money, or trust — named, not euphemized.
- Rollbacks are entries too. Reverting bad work is a decision we made, not an event we hide.
Want a project run like this?
Same ledger, your project: weekly shipped/fixed/broke updates, costs named in plain English, and a working prototype before you commit.